INTERNATIONAL RESEARCH JOURNAL OF SCIENCE ENGINEERING AND TECHNOLOGY

( Online- ISSN 2454 -3195 ) New DOI : 10.32804/RJSET

Impact Factor* - 6.2311


**Need Help in Content editing, Data Analysis.

Research Gateway

Adv For Editing Content

   No of Download : 44    Submit Your Rating     Cite This   Download        Certificate

PROFIT FUNCTION OF TWO UNIT PARALLEL SYSTEM WITH BAD WEATHER CONDITIONS AND ACTIVATION TIME

    2 Author(s):  URVASHI GUPTA ,PAWAN KUMAR

Vol -  12, Issue- 2 ,         Page(s) : 31 - 42  (2022 ) DOI : https://doi.org/10.32804/RJSET

Abstract

The present paper deals with two non identical units A and B. Here unit A is in operative mode and unit B is in standby mode. Unit A does not work in Bad Weather Condition (BWC) and it will take some activation time before starting its operation after the disappearance of Bad Weather Condition and repair. Also, Preventive maintenance is given to unit A after a random period of time to improve the efficiency of unit A. In this paper, priority is given to repair and activation to make system operative over preventive maintenance.

Goel, L.R et.al (1985): Cost analysis of a system with intermittent repair and inspection under abnormal weather,  Microelectron Reliability, Vol. 25, pp. 665-668.
Gupta, R. and Sharma, V., (2010): A two unit standby system with preventive maintenance and universe Gaussian repair time distribution, Journal of Informatics and Mathematical Sciences, Vol.2(2&3), pp. 183-191.
Kapur, P.K. and Kapur, P.R. (1975): A two dissimilar unit redundant system with repair and preventive maintenance, IEEE Trans. Reliability, Vol. 24, pp. 274-277.




*Contents are provided by Authors of articles. Please contact us if you having any query.






Bank Details